palletcentral

NWPCA Fire Code Compliance Manual

Issue link: http://palletcentral.uberflip.com/i/919038

Contents of this Issue

Navigation

Page 41 of 89

36 HOT WORKS PROGRAM NWPCA Fire Code Compliance Manual for Outdoor Storage of Wood Pallets | Version 1.0 (December 2017) HOT WORK PERMIT Permit Valid for One Day Only - Post a Copy* at Site of Hot Work Operations Includes welding, use of cutting torch, grinding, or any operations producing heat, sparks, or open flame. Final inspection is made 2-hours after the completion of hot work to detect and extinguish possible smoldering fires. The inspector should be alert for circumstances that can require an extension of the final inspection interval. Management, the Permit Authorizing Individual (PAI), or the operator can extend the duration of the fire watch based on fire hazards or work being performed. An additional check, 2-hours after completion is required. Completed by:___________________________________________ Date: ________ Time: ________ Crew:________________________________________________________________ Bldg./ Area:__________________________________________________________ Description of Work:__________________________________________________ Anticipated Start Time:____________________ Anticipated End Time: _____________________ Unusual Conditions:__________________________________________________ Confined Space Close Quarters Potentially Hazardous Environment Work on Flammable or Combustible Containers (Follow NFPA 326) Other ____________________________________ Fire Watch Assigned: Yes No Name of Fire Watch:_________________________________________________ Post-Shift Fire Watch: Yes No Name of Post-Shift Fire Watch or Reasons Why None Assigned:____________________________ Outside Contractor: Yes N/A Contracts and Insurance Certificates obtained:____________________________________________ Yes No Hot Work Procedures have been explained to Contractor's Rep. and will be followed: Signed: _______________________________________ __________________________________________ (Contractor's authorized representative) (Contractor's firm) When above is complete, submit permit to Plant Manager for approval, before starting work. Time Work Start: _________ Completed: __________ Performed by: _______________________________________________________ FINAL CHECK OF HOT WORK AREA MADE AT: (time & date) ________________________ (normally 1/2 hour after hot work) PERFORMED BY:_______________________________ *Post a copy of this Permit at the start of Hot Work, for the entire duration of the work. Bright color copy paper is recommended, to make the site evident.

Articles in this issue

view archives of palletcentral - NWPCA Fire Code Compliance Manual